Blog > October 2026 > How to Optimise Your Office Space for Team Collaboration Open
October 28, 2026 8 min read time
Key Insights
- Harvard Business Review's found that time spent in collaborative activities has risen by 50% or more over two decades, and that 20% to 35% of value-added collaboration comes from just 3% to 5% of employees.
- Gartner's survey of 329 marketing leaders and 78 leaders in other functions found 84% report high levels of "collaboration drag", and that affected employees are around 15 times more likely to feel burned out and nine times more likely to plan to leave within a year.
- Gensler's research shows time spent working alone in the UK fell from 66% in 2008 to 36% in 2025, meaning most offices are still laid out for a work pattern that ended years ago.
Collaboration lands on HR's desk more often than on anyone else's. Engagement scores dip, a team says it feels disconnected, a manager asks for more breakout space, and the request that reaches facilities is usually some version of "we need somewhere for people to work together".
The research points somewhere more specific. Employees are already collaborating far more than they were, and the cost of that collaboration is showing up in burnout and attrition figures that HR owns.
This guide sets out a practical approach: understand where collaboration is genuinely blocked, match space types to the work they actually support, protect focus time as deliberately as you protect meeting time, and get visibility of what your teams use. Each section ends in something you can act on this quarter.
“20% to 35% of value-added collaboration comes from only 3% to 5% of employees”
– Harvard Business Review
What actually stops teams collaborating well in the office?
Very few organisations suffer from too little collaboration. Harvard Business Review's research found that people at many companies spend around 70% of their time in meetings or answering colleagues' requests, leaving very little room for the work they are individually accountable for.
The distribution is the more serious problem. That same research, drawn from more than 300 organisations, found that 20% to 35% of value-added collaboration comes from only 3% to 5% of employees, which means a small group of well-connected people absorbs most of the demand. HR usually meets those people later, during an exit interview.
Gartner's work on collaboration drag puts numbers on the consequences. Employees experiencing it are roughly 15 times more likely to report burnout and nine times more likely to be planning an exit, and organisations with high levels of it are 37% less likely to hit revenue goals.
The blockers that show up repeatedly are concrete and fixable:
- No suitable room at the moment it is needed. Two people with a ten-minute problem book a six-person room for an hour because that is what is free.
- Meetings that run because the room was booked, rather than because a decision needed making.
- Unclear decision rights, so the same discussion recurs with a wider group each time.
- Hybrid meetings where remote participants cannot follow, which quietly pushes real decisions into side channels.
- Nowhere to go afterwards, so follow-up work never happens while the context is fresh.
How much of your office should be built for collaboration?
More than most floor plans currently allow, and the shift is measurable. Gensler's research shows that time spent working alone in the UK dropped from 66% in 2008 to 36% in 2025, so a floor designed around individual desks with a few meeting rooms attached is calibrated to a pattern that has since inverted.
That does not translate into removing desks and installing sofas. Gensler also reports that only 26% of employees strongly agree their workplace helps them do their best work, and names availability and noise as the persistent problems, both of which get worse when collaboration space is added without acoustic separation.
Run a short audit before changing anything. Five questions will tell you most of what you need:
- How many meeting rooms do you have at each size, and how many bookings are for two or three people?
- What proportion of bookings are never checked into?
- How long does someone wait for a bookable room during Tuesday to Thursday peak hours?
- Which teams book the most, and which never book at all?
- Where can two people talk for ten minutes without booking anything?
Offices tend to have formal rooms and open desks, with nothing designed for the short unscheduled conversation that most collaboration actually consists of.
Which spaces genuinely improve collaboration, and which only look collaborative?
The spaces that work are sized to the conversation and sit close to where people already are. The ones that disappoint are usually oversized, remote from the teams they serve, or acoustically open in a way that makes people self-conscious.
| Space |
What it genuinely supports |
How it usually fails |
| Two to four person huddle room |
Quick decisions, one-to-ones, pair work |
Under-provided, so people occupy large rooms instead |
| Six to eight person meeting room |
Team stand-ups, project sessions, client calls |
Booked for two people, or held for an hour by habit |
| Project or team room |
Multi-week work with materials left in place |
Quietly colonised permanently by one team |
| Open lounge or breakout |
Informal contact, cross-team encounters |
Positioned next to focus desks, so it generates complaints |
| Enclosed call booth |
Private calls, joining a hybrid meeting properly |
Cut from the budget, then missed daily |
| Large boardroom |
Formal and external meetings |
Sits empty most of the week while smaller rooms queue |
Meeting technology deserves particular attention because of how differently formats perform. Gartner's Digital Worker Experience survey of 4,861 employees across the US, UK, India and China found in-person meetings rated most productive at 46%, with hybrid meetings second-least productive at 17%.
Since most meetings in a hybrid organisation now include at least one remote participant, room audio and camera quality has become a collaboration variable rather than an IT detail. A room where remote colleagues cannot hear clearly will train people to stop using it.
How do you protect focus time while increasing collaboration?
Protecting focus is part of optimising for collaboration, because exhausted people collaborate badly.
Four measures are within HR's gift and cost nothing structurally:
- Meeting-free blocks, applied to a consistent half-day so teams can plan around them.
- Default meeting length of 25 or 50 minutes, which returns several hours a week per person and creates space between sessions.
- A named decision owner on every recurring meeting, which is the direct remedy for the unclear decision rights in Gartner's collaboration drag findings.
- A review of who sits on which recurring invitation, aimed specifically at the small group carrying disproportionate collaborative load.
The last one matters most and gets done least. Identify the people whose names appear on the largest number of recurring invitations and remove them from the meetings where they are present as insurance rather than as contributors.
How do you know which spaces your teams actually use?
You measure it, and this is where most collaboration programmes stall. Room bookings tell you what people intended, check-in data tells you what actually happened, and the gap between the two is where the real information sits.
The data HR benefits from is fairly specific:
- Utilisation by room size, which reveals whether your room mix matches your meeting sizes
- No-show rates, which show how much bookable capacity is lost to reservations nobody uses
- Booking patterns by team, which identify who has adapted to the office and who has quietly stopped coming in
- Peak hour pressure, which tells you whether people can get a room when they need one
- Guest and visitor activity, useful where teams host clients or partners regularly
This is the category commonly called workspace management software, and it is what turns a collaboration strategy into something you can evaluate.
Door Tablet is one example of how the pieces fit together:
- Room booking panels outside each room integrated with Microsoft 365, Google Workspace, Exchange and many more scheduling platforms
- Check-in that releases unclaimed rooms and desks back to the pool
- Interactive and non-interactive wayfinding so employees and visitors can find a room or desk easily
- Resource monitoring in the admin console showing real-time utilisation, active meetings and check-in status across every connected display.
For HR specifically, the resource monitoring view is the useful part, because it converts "the teams say they feel disconnected" into a set of figures you can take to a facilities conversation. Panels can also be branded to match your internal identity, which matters more than it sounds when the goal is making the office feel like somewhere people choose to be.
What does a practical optimisation plan look like?
Six steps, running over roughly one quarter. Nothing here requires a building project.
- Weeks 1 to 4, measure. Pull booking and check-in data, room sizes, and no-show rates. Survey employees on one question: can you find a suitable space when you need one?
- Week 5, find the mismatch. Compare average meeting size against your room mix. Most organisations discover they need more small rooms and fewer large ones.
- Week 6, subdivide before you build. Converting one large under-used room into two huddle rooms is faster and cheaper than any other intervention available to you.
- Weeks 6 to 8, fix the hybrid experience. Audit audio and camera quality in every room used for meetings with remote participants, and fix the worst three.
- Week 8, set the rules. Introduce meeting-free blocks, shorter default lengths, check-in requirements and named decision owners, and publish them.
- Week 12 onward, re-measure. Compare no-show rates, small-room utilisation and the survey question against your week 1 baseline.
Capturing the baseline in step one is what makes the rest defensible. Without it, any improvement becomes a matter of opinion at the next budget discussion.
FAQ's
How much collaboration space does an office need?
There is no reliable universal ratio, and the useful figure comes from your own average meeting size versus your current room mix. Most organisations find they are short of two to four person rooms and over-supplied with large ones.
Does open plan improve collaboration?
Not reliably, and it often reduces the informal conversation it was meant to encourage. Open areas work best positioned away from focus desks and paired with enclosed rooms people can move into.
What are workspace management tools, and do we need them?
Workspace management tools help organisations manage meeting rooms, desks and shared spaces through booking, check-in, availability displays and utilisation reporting.
Whether you need them depends on how your workplace operates. Larger organisations may benefit from a complete workspace management solution, while smaller teams can adopt individual tools, such as room booking displays. Even teams of fewer than 10 people can benefit from simpler bookings, fewer scheduling conflicts and better use of their space.
How do we stop meeting rooms being booked and left empty?
Try Door Tablet’s Room Booking System. You can require check-in and release unclaimed rooms automatically after a set period.
Should HR or facilities own this?
Both, with HR owning the meeting norms and the load distribution, and facilities owning the space mix and the technology. The measurement should be shared, because each side's decisions change the other's numbers.
How quickly will we see a difference?
Room mix changes and check-in enforcement usually show up in utilisation data within four to six weeks. Shifts in engagement and burnout indicators take a full cycle, so plan to review them at six months rather than six weeks.
Where should HR start with collaboration space?
Start with the data you already have, which is almost always your calendar and booking records. Average meeting size against room mix, and no-show rate against total bookings, will identify your two biggest problems in an afternoon, and both are usually fixable without capital expenditure.
From there the sequence holds up well: subdivide oversized rooms, fix hybrid audio in the rooms people actually use, protect focused time as firmly as you protect meeting time, and watch who is carrying the collaborative load. Better collaboration comes from removing friction and redistributing demand, and the office is one of the few levers HR can pull directly.
The teams that feel disconnected are rarely asking for more meetings. They are usually asking for the right conversation to be possible at the moment it matters.
Want to see what your meeting rooms are actually doing?
Door Tablet provides the measurement layer this article keeps pointing at. Room booking panels outside each room connect to your scheduling system, check-in releases unclaimed rooms and desks back to the pool. Everything reports into a single admin console showing real-time utilisation, active meetings and check-in status across every connected display, which is where your no-show rate and your room mix mismatch become visible.
Book a call with our team if you want to talk through what that would look like across your own floors. Bring your current room list and your booking data if you have it, and the conversation can be specific rather than general.
Blog > October 2026 > Room Booking Solution: Build vs. Buy Guide Open
October 21, 2026 6 min read
Balancing engineering priorities against everyday office operations is a common challenge for growing organisations. With the rise of modern development tools and generative AI, the temptation to build an internal scheduling tool has never been stronger. If choosing between buying a commercial room scheduling solution or building one in-house is on your table right now, let us look at which path truly makes sense for your business.
Key takeaways
- Internal builds create severe developer opportunity cost, pulling engineering teams away from revenue-generating products to manage non-core office scheduling systems.
- Generative AI accelerates basic code writing, not system architecture, leaving critical gaps in distributed state synchronisation, concurrency management, and long-term design governance.
- Cross-platform client and server demands multiply complexity, requiring teams to build and maintain separate codebases across web, mobile, calendar add-ins, and hybrid backend mail systems.
- Post-launch maintenance accounts for roughly 80% of total software costs, making custom tools far more expensive than predictable SaaS subscriptions.
- Custom applications fail at physical meeting room doors because consumer tablets lack enterprise resilience, and maintaining continuous firmware, PoE connectivity, and RFID compatibility requires dedicated Pro Hardware support.
The trap of "We'll Just Build It Ourselves"
The push for custom internal tools usually starts with the same alluring trap: "We have the developers, so why spend money on an outside solution when we can just build it ourselves for cheaper?"
Today, that argument often comes with a modern twist: "Can’t our developers just use AI to code this over a sprint or two?"
While generative AI tools can rapidly churn out boilerplate scripts and basic web forms, AI does not provide enterprise system architecture or long-term design governance. AI cannot architect a distributed, fault-tolerant infrastructure capable of handling race conditions when hundreds of employees book rooms simultaneously. Nor can it design a future-proof roadmap that adapts when underlying enterprise identity frameworks or calendar APIs change. Code generation is fast; architecting and maintaining resilient enterprise systems is a multi-year discipline.
Once projects launch, internal teams quickly encounter the scope creep waterfall. A basic calendar connection must expand to handle interactive floorplan engines, single sign-on (SSO) protocols, complex user permission hierarchies, and multi-tenant security structures. What was scoped as a brief project turns into an ongoing multi-year software development lifecycle.
This shift creates a severe developer opportunity cost. When you pull core software engineers off your commercial, revenue-generating products to debug internal scheduling tools, your primary business suffers.
Internal builds introduce significant financial trade-offs and risks:
- Creating a Minimum Viable Product (MVP) takes at least 6 to 10 weeks of engineering time. In comparison, setting up a commercial Software as a Service (SaaS) solution only takes about 14 days.
- Engineering salaries for a four-person internal build team average £360,000 in upfront labour costs alone.
- 52% of all projects experience scope creep.
- Upward of 80% of total software cost occurs during the post-launch maintenance phase, not the initial build.
- Internal dev teams spend approximately 38% of their time managing software bug fixes.
The architectural maze: diverse front-ends and hybrid backends
A robust room booking ecosystem is not a solitary web dashboard, it is an intricate, multi-tier distributed environment. An internal build forces your engineering team to design, support, and continually patch two highly fragmented layers:
1. Fragmented client front-ends
Employees expect to book workspaces from wherever they happen to be working. Delivering an acceptable user experience requires building and maintaining distinct client applications:
- Responsive desktop browser portals.
- Native iOS and Android mobile apps.
- Native calendar add-ins for Microsoft Outlook and Google Workspace.
- Interactive wayfinding kiosks and interactive floor plans.
- Dedicated, locked-down room display interfaces.
Each front-end demands its own UI framework, device testing protocols, authentication lifecycle management, and regular operating system update maintenance.
2. Hybrid client-server synchronicity
Behind the user interface lies the challenge of server integration. Enterprise organisations frequently operate across heterogeneous environments, spanning Microsoft 365, on-premises Microsoft Exchange, Google Workspace, or HCL Domino.
Building an engine that handles bi-directional real-time synchronisation, webhook subscriptions, granular delegate permissions, and calendar conflict resolution without double-booking rooms introduces an enormous architectural burden. If your sync engine drops a single webhook or mismanages a recurring reservation edge case, meetings collide and office operations stall.
Head-to-head breakdown: internal builds vs. commercial platforms
| Evaluation Criteria |
Custom Internal Build |
Commercial Platform (e.g. Door Tablet) |
| Initial Deployment Timeline |
6 to 12 months from scoping to initial testing. |
48 hours to 2 weeks for full tenant provisioning. |
| Architectural Design & AI |
AI helps generate code syntax, but leaves overall architecture, conflict resolution, and technical debt to your engineers. |
Purpose-built enterprise architecture designed for long-term scalability and continuous vendor governance. |
| Multi-Client & Server Support |
Requires developing and maintaining separate apps for web, iOS, Android, Outlook/Google plugins, and hybrid mail servers. |
Out-of-the-box native client apps, calendar plug-ins, and seamless synchronisation with Microsoft 365, Google, and HCL Domino. |
| Pro Hardware Integration |
Requires custom low-level driver development for peripheral lights, sensors, and card readers. Prone to consumer tablet failures. |
Pre-built driver ecosystem for dedicated enterprise touchscreens, PoE hardware, and status indicators. |
| Long-Term Security Maintenance |
Internal responsibility for continuous patch management, SSO renewals, and SOC 2 audits. |
Vendor-maintained ISO 27001, SOC 2 compliance, and enterprise encryption protocols. |
| Total Cost of Ownership (TCO) |
High ongoing costs through developer salaries, server hosting, and API maintenance. |
Predictable, fixed subscription fees covering support, hosting, and continuous feature updates. |
The hardware integration barrier: why custom apps fail at the door
Workplace software does not live entirely in the cloud; it depends heavily on on-site, physical touchpoints. This is where internal software projects face their steepest hurdle: bridging cloud databases with physical meeting room wall endpoints.
Many internal builds begin by mounting consumer tablets (such as iPads or consumer Android devices) to walls using generic enclosures. However, consumer hardware is not engineered for 24/7 commercial operation. Continuous power causes battery swelling and hardware failure, standard screens suffer from severe burn-in, and unpredictable operating system popups interrupt meetings.
True enterprise reliability requires integration with dedicated Pro Hardware:
- Peripheral status controls: Interfacing directly with hardware controllers to drive real-time side-bar LED status indicators (green for available, red for booked) and occupancy sensor relays.
- Enterprise badge authentication: Native low-level driver support for multi-frequency RFID, NFC, and HID card readers for instant tap-to-book and tap-to-release check-ins.
- Power over Ethernet (PoE): Industrial-grade network connectivity and power delivery over a single cable, bypassing unstable office Wi-Fi networks.
- Locked-down firmware: Purpose-built kiosk firmware that prevents tampering and automatically recovers after power or network interruptions without manual IT intervention.
Writing a basic tablet user interface application is straightforward. However, maintaining continuous firmware compatibility and low-level peripheral drivers across dozens or hundreds of hardware wall endpoints is where internal IT resources break down. Commercial systems like Door Tablet eliminate this friction by providing dedicated hardware and software ecosystems engineered to work together without custom code.
FAQ’s
Can't our developers just use AI to build a room booking app quickly?
AI coding assistants are effective at generating code snippets and basic UI components, but they cannot design resilient system architecture. AI cannot resolve multi-system calendar race conditions, architect cross-platform state synchronisation across Microsoft 365 and Google Workspace, or write the low-level firmware drivers needed to communicate with physical door display hardware and RFID readers.
What are the main disadvantages of building custom workplace tools?
The main disadvantages are the high total cost of ownership, severe developer opportunity cost, and long-term maintenance debt. Internal teams must continually update APIs, patch security vulnerabilities, maintain multiple client codebases, and rewrite drivers for office hardware, diverting engineering resources away from the company's core commercial products.
Why do custom apps struggle with dedicated door displays?
Custom applications rarely integrate natively with professional meeting room displays. Enterprise door panels require specialised low-level firmware to manage hardware peripherals like external LED status lights, multi-format RFID badge readers, and PoE power negotiation—capabilities that commercial platforms support natively out of the box.
Should you build it yourself?
Unless your company's primary commercial revenue engine is workplace facilities optimisation, building an internal platform incurs a net-negative ROI. The hidden development debt, the architectural complexity of multi-client and server ecosystems, and the specialised demands of Pro Hardware integration make commercial acquisition the clear, financially sound choice.
Contact our team to discover how Door Tablet delivers a comprehensive, enterprise-ready room booking ecosystem tailored to your workspace.
Blog > October 2026 > The Sensory-Friendly Office: Designing for a Neurodiverse Workforce Open
October 14, 2026 4 min read
A floor plan that fails a neurodivergent employee is a badly engineered workspace. We need to stop viewing neurodiversity as a special accommodation and start treating it as the baseline for usability. Companies spend millions on commercial real estate only to create spaces where their teams cannot actually concentrate. When you build an environment that supports complex sensory needs, you naturally remove friction for the entire workforce.
Key Takeaways
- Traditional open offices fail the 15 to 20% of the workforce who are neurodivergent because constant noise and movement drain their cognitive energy.
- Sensory processing spans a wide spectrum. A functional floor plan accommodates both hyper-sensitive and hypo-sensitive individuals through properly zoned, activity-based spaces.
- Spatial uncertainty causes executive dysfunction. Using clear digital booking interfaces removes this anxiety and creates a predictable, highly usable environment.
The Sensory Real Estate Gap: Why Open Plans Fail 20% of Your Workforce
The traditional open plan office actively drains the energy of your staff. CIPD research on neurodiversity at work indicates that 15 to 20% of the workforce is neurodivergent. That equates to roughly one in seven of your people, encompassing individuals with ADHD, Autism, Dyslexia, and Dyspraxia.
Placing these employees in a massive room with identical desks guarantees a high sensory tax. This tax comes from constant movement in peripheral vision, unpredictable ambient noise, and sudden interruptions.
People are forced to spend their cognitive energy filtering out background chaos instead of doing their actual jobs. The open office model assumes a uniform human response to environmental stimuli (and we already know the open office model is not beneficial for neurotypical individuals either; read this article to find out more). That assumption is factually incorrect, and it is costing you productivity.
“A lack of awareness and understanding has led to hiring processes, management practices and workspaces being designed only with neurotypicals in mind.”
- Neurodiversity at work. 2018, CIPD
The Spectrum of Sensory Processing: Hyper-Sensitivity vs. Hypo-Sensitivity
Creating a sensory-friendly office layout requires moving past the misconception that neurodiversity just means installing more quiet rooms. Sensory processing exists on a very broad spectrum.
Hyper-sensitive individuals require environments with low visual stimulation and heavy acoustic dampening to maintain focus. Hypo-sensitive individuals experience the exact opposite need. They require tactile variance, dynamic movement, and higher levels of stimulation to remain engaged with their work.
A successful floor plan accommodates both ends of this spectrum through properly executed activity-based working. Employees must have the autonomy to migrate between distinct environmental settings as their daily cognitive needs shift.
“60% of employers we surveyed say that neuroinclusion is a focus for their business”
- Neuroinclusion at work report. 2024, CIPD
Architectural Levers: Key Principles from BSI PAS 6463
The BSI PAS 6463:2022 standard serves as the definitive UK standard for neurodiversity and the built environment. It provides a concrete framework for sensory-inclusive lighting, acoustics, and spatial sequencing. Use these principles to make measurable architectural choices for your workspace.
Spatial Sequencing and Buffer Zones
You cannot force an employee to move immediately from a loud entrance hall into a quiet focus zone. It creates a jarring sensory transition. Effective sequencing uses buffer zones to create gradual transitions between active collaborative hubs and isolated work areas. Placing a low-traffic corridor or a transitionary lounge between the bustling cafeteria and the deep work library gives the nervous system time to adjust.
Lighting and Visual Glare Reduction
Lighting dictates office usability just as much as your furniture budget. Flickering fluorescent lights and harsh overhead beams frequently trigger migraines and visual fatigue. The standard dictates a shift toward dimmable, indirect LEDs. Allowing employees to control the lux levels in smaller pods or meeting rooms gives them immediate agency over their visual environment.
Acoustic Engineering vs. Uncanny Silence
Acoustic glare is the highly distracting quality of specific noises, like a single loud conversation in a quiet room. Good acoustic engineering masks this glare without creating an uncanny, eerie silence. Complete silence is a mistake because it makes every minor sound highly noticeable. Your goal is to cultivate a consistent, predictable level of natural background noise in social zones while heavily insulating quiet focus zones.
The Predictability Factor: Reducing Cognitive Load Through Spatial Tech
Spatial uncertainty exhausts executive function. As noted by occupational psychologist Dr. Nancy Doyle, environmental stressors directly increase executive function load. When an employee spends 15 minutes hunting for an available desk or worrying about room theft, they burn through cognitive reserves before they even open their laptop.
Good ADHD friendly office design relies on making the environment entirely predictable. Physical-digital interfaces bridge the gap between architectural intent and daily reality.
- Interactive Schedule Displays: Door Tablet panels mounted outside meeting spaces provide immediate visual certainty. They feature colour-coded ambient status lights that clearly broadcast a room's availability from across the floor. This eliminates the need to awkwardly peer through glass doors.
- Touch Interfaces: The displays allow for instant booking at the door, securing the space immediately and reducing anxiety.
- Intuitive Wayfinding Signage: Placing clear visual maps and digital wayfinding signage at key decision points reduces navigation stress. Employees can orient themselves instantly and find their booked space with confidence.
Universal Design Benefits the Entire Floor Plan
Neuroinclusive workspace design is simply universal design. Designing an office for the 20% of your workforce who are sensory-sensitive effectively cleans up the friction, noise, and confusion for the remaining 80%. Absolutely no one benefits from bad acoustics, visual glare, or spatial uncertainty.
A real estate strategy grounded in solid research and standards like BSI PAS 6463 removes the physical barriers that hold back human performance. Workplaces must be engineered for human minds. When you build spaces this way, people can focus their energy on their actual jobs instead of fighting their physical environment.
FAQs
Does the traditional open office work for neurodivergent employees?
No. The open plan actively drains staff energy by guaranteeing a high sensory tax. This tax comes from constant movement in peripheral vision, unpredictable ambient noise, and sudden interruptions.
Does a neuroinclusive office just mean adding more quiet rooms?
No. Sensory processing exists on a broad spectrum. Hyper-sensitive individuals need low visual stimulation and heavy acoustic dampening, while hypo-sensitive individuals require tactile variance and dynamic movement. A successful floor plan accommodates both ends of the spectrum through activity-based working.
How does spatial technology help neurodivergent employees?
Spatial technology eliminates the uncertainty that exhausts executive function. Door Tablet meeting room panels provide immediate visual certainty regarding room availability, allow instant booking at the door, and use clear wayfinding signage to reduce navigation stress.
Blog > October 2026 > What 3 Companies Did With the Space Where the Desks Used to Be Open
October 7, 2026 4 min read

Key takeaways
- UK offices reduced desk ratios from 79 to 56 per 100 employees, converting the recovered floor area into small enclosed rooms and flexible zones for collaborative work.
- Fixed in-office days create predictable attendance peaks, which cause 43% of workers to cancel meetings when they cannot find an available room.
- Door Tablet screens eliminate hallway confusion by displaying real-time availability, and the software captures accurate utilisation metrics that building-level badge counts miss.
UK offices now provide 56 desks for every 100 employees. In July 2022, the figure was 79.
That comes from AWA's Hybrid Working Index, and it is probably the most useful number in workplace design right now. Roughly a third of British desks have disappeared in four years. The floor space did not disappear with them.
So something took their place. This is about what.
Three companies have already done that work for you. Each completed a major redesign between 2023 and 2025, in different sectors and at very different budgets, and each solved a different part of the problem.
The floor got rebalanced, not emptied
The clearest way to see the shift is CBRE's occupancy data. Between 2021 and 2023, private space fell from 56% of office floor area to 45%. Collaborative space went from 14% to 20%.
Private space includes assigned desks and enclosed offices. Collaborative space includes meeting rooms, but also lounges, project areas and the sort of half-formal seating that has no good name yet. The office did not get smaller so much as it changed what it was mostly made of.
CBRE's 2026 occupancy report found that 68% of employees name collaborating with colleagues as their main reason for coming in. Focused work migrated home. What was left behind was the part that needs other people in the room, and rows of identical desks are a poor container for that.
JLL's 2026 occupancy benchmark shows where the space went in practice: private offices continuing to decline, with phone booths, focus rooms and small meeting rooms rising in their place. Not open plan. Small enclosed rooms, in quantity.
Three companies, three different designs
Lloyds Banking Group, 125 Colmore Row, Birmingham

Overbury's refurbishment of Lloyds' regional head office covers 151,000 sq ft across nine levels and took 72 weeks. It is the largest single-occupier office fit-out ever completed in the city.
The interesting number is the seat mix. The building supports over 1,750 people with more than 1,300 desks and over 600 alternative work settings, including booths and breakout areas. So desks are now roughly two-thirds of the seats rather than all of them. The number of meeting rooms was doubled.
Collaboration spaces on every floor, an events space sized for town halls, a broadcast studio for filming on site, a tech bar for walk-up IT support. Plus a gym, a music room and a contemplation space, all designed for wheelchair access.
What to take from it: the desk count is no longer the plan. It is one line in the plan. If you double the meeting rooms, the arithmetic of a smaller desk count starts to work.
NatWest Group, 250 Bishopsgate, London

You do not need to build a new office when you can refurbish the old one.
NatWest consolidated its London portfolio from six major buildings down to two, and 250 Bishopsgate became the head office. It is an 11-storey glass and steel block designed by EPR Architects in 1998, which is to say a thoroughly desk-centric building from the tail end of the cubicle era. LOM architecture and design retrofitted it in phases, during and after the pandemic, without closing it. Staff kept working while the work went on around them.
The specification was reuse first. Ceilings, storage, desks and chairs were repurposed rather than skipped. Recycled desktops, mobile furniture and moveable walls make up reconfigurable areas that LOM calls Flexi Zones, which can be rearranged for teamwork, quiet work or events. The old ground-floor dealer floor became a 300-seat conference centre. An old third-floor meeting centre became a co-working floor. A previously inaccessible ninth-floor roof terrace became a garden with fruit trees and herbs, and the basement car park became cycle storage with showers.
The result was around 1,000 sq m of additional usable space and a doubling of occupancy within the existing structure.
What to take from it: you can double the capacity of a 1990s floor plate without new furniture and without a new lease.
GAMA Healthcare, Hemel Hempstead

GAMA Healthcare successfully drew staff back to its 20,000-square-foot Hemel Hempstead office by replacing identical rows of desks with varied, task-based zones. The company designed this hybrid workspace to give different departments the specific facilities they need under one roof.
Instead of a traditional open plan, the layout centres around a bright breakout area featuring tiered seating and two treehouse meeting rooms. This core space connects directly to a large kitchen and games area for informal socialising. Throughout the rest of the floor plan, employees have access to flexible furniture, a dedicated training suite, and distinct workstations tailored to their daily tasks.
What to take from it: Replacing a standard sea of desks with diverse, task-based zones turns an empty office into a practical destination. You make the commute worthwhile by offering a mix of flexible workstations and social hubs that genuinely support how people actually work.
The bit that furniture cannot fix
Here is where the redesigns run into something a floor plan will not solve.
JLL's 2026 benchmark found that 62% of organisations now require fixed in-office days, up from 49% the year before, and 70% of employees attend three to five days a week. Fixed days mean predictable peaks. Everyone arrives on the same three days, which means the settings you carefully specified are oversubscribed on Tuesday and empty on Friday.
The Gensler survey shows exactly what that looks like from the floor. 65% of workers use meeting rooms for solo focused work. 64% take calls in hallways. 43% cancel meetings altogether when they cannot find a room.
JLL makes the same point from the estates side: building-level badge counts cannot tell you whether a particular space is working, and space-level utilisation data is what separates a redesign you can defend from one you merely hope about. If you are about to spend seven figures rebalancing a floor from desks to rooms, the least useful thing you can do afterwards is guess at whether the rooms get used.
Which is the argument for putting something on the door. Not because a screen is exciting, but because a room nobody can find is the same as a room you did not build.
Your office redesign created the right spaces. Door Tablet ensures your staff can actually find and use them.
A physical screen outside the room solves the immediate hallway confusion. When an employee stands outside a focus room on a busy Wednesday, a Door Tablet display shows exactly when that space is free. They do not need to check a phone or guess if the occupant is just finishing a call. The meeting room tablets provide an immediate, local answer with a clear visual indicator.
The software handles the predictable peaks. It integrates with your existing calendar system; Door Tablet lets staff secure rooms from their laptop. If a meeting ends early or someone does not tap in at the door, the system automatically releases the room back to the floor. The space becomes instantly available for other meetings.
You collect actual usage data from these physical interactions. Building-level badge counts cannot tell you whether a particular space is working. Door Tablet workspace analytics record exactly which small meeting rooms get booked, which booths sit empty, and when people actually check in for their reservations. This replaces hopeful guesswork with utilisation metrics.
Your office redesign created the right spaces. Door Tablet ensures your staff can actually find and use them. Book a demo today!